New Build Extension to Warehouse, Eurocentral

Client – Consarc Engineering Limited

Project Sector – Private Sector

Project Description – New build 9,000ft² high bay warehouse extension with associated offices and toilets including large concrete yard area and parking.

Role – We were appointed Main Contractor after a recommendation from the next door neighbour for whom we had just completed a 40,000ft² new build project. We undertook to design, manage and co-ordinate the construction works using both sub-contractors and our own direct labour.

The works involved the construction of a steel framed structure with insulated walls and roof panels, connecting into the existing factory through new openings.

The concrete floor slab and concrete yard area was one of the most important factors on the project where a perfect finish was achieved due to carefully managed preparation and close site supervision of the works.

We were required to cast in to the new floor a steel box to form a pit 4.5m deep.

This new extension was required to be built with minimum disruption to the operation of the Client’s manufacturing business. This was achieved due to close communication with the Client’s operational staff and scheduling deliveries to minimise disruption.

This project was handed over on schedule with zero defects.